Low Volume Injection Molding
Low volume injection moulding is the route from prototype to market without the cost of hardened production tooling. With aluminium soft tooling from 25 pieces and steel bridge tooling to about 10,000, you get real moulded parts fast, then a clear path to hardened steel if the volume scales.
Free ConsultationMaterials
| Grade | Properties | Typical Applications |
|---|---|---|
| ABS | Cost effective and cosmetic, the common choice for low volume housings and enclosures where paint or texture is wanted. | Housings, brackets, enclosures, consumer goods |
| PP | Light, chemical resistant and cheap, good for containers, liners and living hinge parts at low volume. | Containers, liners, hinges, industrial bins |
| PC | Transparent and impact resistant, used where the low volume part must be clear or dropped. | Covers, lenses, transparent windows |
| PA66 | Engineering grade for load carrying low volume parts such as gears and brackets, natural or glass filled. | Gears, brackets, connectors, mechanical parts |
| ABS PC Blend | Tough and heat resistant for low volume enclosures that are dropped or warm, covered in detail on our ABS PC blend page. | Equipment housings, bezels, structural shells |
| TPE and TPU Overmould Options | Soft touch elastomer over a rigid substrate for grips and seals, available as insert or two-shot on compatible low volume programs. | Grips, seals, bumpers, cable strain reliefs |
Process Parameters
| Parameter | Standard Range |
|---|---|
| Aluminium Soft Tooling Lead Time | 2 to 3 weeks |
| Soft Tool Life (Aluminium) | 500 to 5,000 shots depending on geometry and filler |
| Steel Bridge Tool Lead Time | 3 to 4 weeks |
| Melt Temperature Window | 200 to 300 degree C by resin |
| Injection Pressure | 500 to 1,400 bar depending on flow length and wall |
| Recommended Wall Thickness | 1.5 to 3.0 mm, optimised for function without hard tooling |
| Mould Shrinkage | 0.4 to 2.5 percent by grade, modelled at design |
| Clamp Force Requirement | 2 to 5 tonnes per square centimetre of projected area |
| Cycle Time | 15 to 70 seconds per part depending on wall and size |
| Part Tolerance | plus or minus 0.05 mm standard, tighter by agreement |
Surface Finishes
As-moulded and Texture
Quick functional surfaces straight from the tool, the default for low volume industrial and internal parts where appearance is secondary.
SPI Polish
Cosmetic gloss surfaces on a polished cavity for low volume premium parts that must look finished.
Painting
Colour match and ultraviolet resistant coating applied after moulding, giving consistent brand colour on small batches.
Pad and Laser Marking
Logos, part numbers and serials marked permanently, used for traceability on low volume production.
In-mould Label (IML)
A pre-printed film becomes part of the surface in one shot, useful for low volume branded packaging and bodies.
Soft Touch Coating
A clear coat improving grip and mar resistance on handled low volume parts such as tool grips.
Design for Manufacturing (DFM)
- Choose aluminium soft tooling for runs under about 5,000 pieces, because hardened steel only pays back above that volume
- Optimise wall thickness to validate function without hard tooling, since a soft tool is the cheapest place to learn
- Combine low volume moulding with CNC machining for hybrid builds where one feature is too tight for the soft tool
- Plan a clear path to hardened steel if volume scales up, so the design does not have to change when the tool does
- Place gates and vents for the soft tool life, because aluminium wears and the early shots should prove the process
- Apply 1 to 2 degree draft, more on textured surfaces, for clean ejection from a softer cavity
- Model shrinkage at design using the actual grade, because the range from PP to filled PA66 is wide
- Keep the production material intent in mind, since the soft tool part should match the production part in function
- Consider multi-material and overmould where the low volume product needs a grip or seal
- Upload STEP, IGES or DXF and receive a free DFM review within 24 hours covering tool route, wall and gate
Tooling & Capacity
| Type | Lead Time | Suitable For |
|---|---|---|
| Aluminium Soft Tool | 2 to 3 weeks | 25 to 5,000 pieces, pilot runs, market testing and design validation |
| Steel Bridge Tool | 3 to 4 weeks | 5,000 to 10,000 pieces where the volume does not yet justify hardened production steel |
| Production Steel Tool | 4 to 6 weeks | 10,000 plus pieces, gloss cavities, filled grades and long run cosmetic parts |
| Multi-Cavity Tool | 5 to 7 weeks | Higher volume runs where cycle time dominates and balanced fill is required |
Quality Assurance
- The resin grade is checked on incoming material against the supplier certificate, with the lot number recorded
- First article inspection with dimensional report before the balance of the run is released
- Wall thickness and shot weight are monitored per cavity to catch short shots and flash early
- Visual inspection for sink, warp, splay and burn on every setup change
- Colour measured and recorded against the reference with delta E reported per lot where painted
- Fit checked by assembly of a sample where the part mates with others
- Melt temperature is checked at the nozzle, since a machine setting is not the true material temperature
- Low-volume resin lot traceability is retained per run, with the supplier certificate filed against it
- Every low-volume lot ships with a dimensional report, material certificate and Certificate of Origin
- SGS, Bureau Veritas or TUV third-party inspection is arranged on request for low-volume moulded parts
Applications
- Startups and seed-stage product launches
- Bridge quantities between prototype and mass production run
- Niche and aftermarket parts
- Spare and service parts
- Customised low-run product variants
- Pre-launch market testing and field trials
- Low volume enclosures and housings
- Laboratory and diagnostic equipment pilots
- Industrial small batch components